Thursday, May 26, 2011

Parts, pieces and a lot of excitement.

A buzz is in the air as the Herreshoff 20 takes shape on Burnside St. in Bristol.  A two page article recently came out in Soundings Magazine by it's sailing editor Dieter Loibner.  It can be found here: Soundings Magazine.

This picture shows a mockup of the coaming and the cockpit seats.  The coaming will be full length quarter sawn teak and the seats will be slatted in a comfortable curved shape.


Tuesday, April 26, 2011

Flipped

The 20 is upright and looking great.  See a short video of the flip here: Flip

Thursday, February 10, 2011

Off the mold.

With the final layer of veneers in place, the H-20 hull was lifted off the mold and for the first time we could see how beautiful the inside of the hull looks. 



Wednesday, January 26, 2011

Glue time!

After much preparation, the diagonal veneers are being epoxied and vacuum-bagged in place.  By orienting these outer layers at 45 degree angles to the first layer of planking we add significant transverses strength to the hull construction.  The result is a stronger and lighter hull than could be achieved using traditional plank-on-frame construction methods.

Tuesday, December 28, 2010

More planking...

First layer of the port side longitudinal planking is on and  the starboard side is being worked on presently.  Once all the glue has cured the surface will be lightly sanded in preparation for the diagonal layers, which are Spanish cedar. 





Monday, December 6, 2010

Planking Commences!


The smell of freshly milled white cedar planking rules the shop at 22 Burnside Street as the first layer of planking receives final fitting.  The H-20 is really taking shape now!