Wednesday, January 26, 2011

Glue time!

After much preparation, the diagonal veneers are being epoxied and vacuum-bagged in place.  By orienting these outer layers at 45 degree angles to the first layer of planking we add significant transverses strength to the hull construction.  The result is a stronger and lighter hull than could be achieved using traditional plank-on-frame construction methods.

No comments:

Post a Comment